SCFE Cane 2 crossing over an irrigation canal, pulling 20 empties bound for the Miami Locks loadout. Of note on Cane 2 this day was the classic power lashup, USSC 303, a 1958 built “Paducah rebu... (more)
SCFE Cane 2 creating a smokeshow as they notch up after dropping 25 empties at the Ritta 1 loadout, which is where the switch in the foreground leads to. Ritta is unique to the SCFE as it is the o... (more)
A South Central Florida Express local freight is seen at Lake Harbor. The train is about to pick up more cars off of a siding just to the West of this location. The GP11 was built in December of 1... (more)
Westbound cane empties approach Moore Haven bound for one of the many loaders scattered throughout the cane fields.
USSC #303 leads a loaded cane job through Moore Haven bound for the mill at Clewiston.
USSC 303 leads a load of sugar cane from the field headed towards the sugar plant.
303 approaches Bryant with a rake of loaded sugarcane, 22 Nov 2017. At Bryant 303 will swap it`s loaded cars for empties and return back to the fields for loading...